The design
Between July 2009 to March 2011 we consulted on a series of repairs which were to be conducted to the stucco façade and the roof of the building, as well as an upgrade to its internal facilities. The project also involved extensive works to the annex of the building, situated at 39 Montrose Place, to the rear of Belgrave Square.
Although a domestic dwelling, works were conducted to make the building once again habitable for the Director and his family by bringing the services up to modern living standards. Provisions were made to improve the heating systems, plumbing, drainage, electrics, and ventilation, and to alter the existing garage to increase the domestic area.
Careful consideration was given to the impact that these changes would have upon the historic fabric of each building.